WIYN 3.5m WHIRC Observing Report for 2014/03/26 Summary: We were not able to get on sky due to high humidity Observer: Kara Ponder Telescope Operator: Krissy Reetz Conditions: wind: 14 mph (high enough to keep the domes closed at the beginning of the night) Humidity: 99 Temperature: 8.5 C Moon: 16% Notes: Had the second half of the night. No issues starting WHIRC.